EnerJet DC-120KW-BX
EnerJet DC-120KW-BX
EnerJet DC-120KW-BX
$12,995.00
- 120kW DC fast EV charger with dual charging points and automatic load balancing
- Connectors: CCS1 + CCS2 or CCS1 + CHAdeMO
- Charge an EV in as fast as 15 minutesÂ
Availability: 10 in stock
- Categories: Vehicle Battery Chargers
- SKU: UEVD-F120-CC/CM
- GTIN: 00860013973070
- Brand: EnerJet
- Estimated shipping time: 2026-12-17
- Free Shipping
Specifications
Affordable EV Charging Station
The EnerJet DC-120KW-B delivers a powerful 120kW of power and can fully charge an EV in 15 minutes. It has a modern design, yet it is sturdy and robust.  Most importantly, it is affordable. Join this lucrative market and purchase your EnerJet DC-120KW-B Today!
Super-Fast EV Charging Station
QUESTIONS & ANSWERS
Frequently Asked Questions
What is the difference between 30KW, 60KW, 120KW and 240KW Level 3 EV Charging Stations?
KW refers to the amount of power of a DC Charger. The higher the KW, the more power the charger delivers. For example, a 240KW Level 3 DC Charger can add 800 miles per hour to an electric vehicle while a 30KW Level 3 DC Charger, adds 100 miles per hour. Â
What is the Difference Between AC and DC Electric Vehicle Charging Stations?
A key difference between AC and DC electric vehicle charging stations is that AC chargers are limited by the vehicle’s acceptance rate. For example, some EV have an acceptance rate of only 3.6 KW.  In such a scenario, an AC charger can only supply 3.6KW of power even if the charger’s rated power is 30KW. On the other hand, a DC charger has a built-in converter and delivers power beyond the vehicle’s acceptance rate. Therefore, a 30KW DC charger supplies 30KW of power regardless of the vehicle’s particular acceptance rate.  Another difference is the voltage. AC chargers are much slower because they only use either 120-volts (Level 1) or 240-volts (Level 2). Level 3 DC chargers, on the other hand, typically run off of 480-volts and three phases. Â
Do the Level 3 EV Charging Stations Accept Credit Card Payments?
Yes. The Level 3 ev charging stations accept all major credits cards through the OCPP software and RFID scanner.  We also work with vendors who provide our customers with a QR-Code to process payments. Â
What is a Nationally Recognized Testing Lab?
A Nationally Recognized Testing Lab (NRTL) is one approved by OSHA. UL and SGS are NRTLs. The current version of the National Electrical Code (NEC) requires ev charging stations to be listed by a NRTL. “Listed” means that an approved NRTL tested the equipment and it can be verified on the NRTL’s website.  Â
Do You Provide Installation Support for the EV Charging Stations?
Yes. We provide after-sales installation support for all the ev charging stations. Â
What kind of maintenance is required for the EV Charging Stations?
The ev charging stations are designed for minimal maintenance. Regularly check connections and clean components as needed. Detailed maintenance guidelines are provided in the user manual, and our support team is available for additional assistance.
EnerJet DC-120KW-BX

Reviews
There are no reviews yet